Paper search
In einem öffentlichen Wettbewerb hat der niederländische Infrastrukturbetreiber ProRail nach Ideen für Maßnahmen im Bahnenergieversorgungsnetz mit dem Ziel der nachhaltigen Senkung des Energiebedarfs und damit des CO2-Ausstoßes gefragt.
October 29, 2009,
Teun Ploeg, Erwin Jonker, Arnhem, Steffen Röhlig und Karsten Preuß
A critical factor affecting transmission system development is the assumed location
and size of generating units. The output of the generators is
set by the assumed generation dispatch.
October 28, 2009,
P. J. Palermo
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
Co-firing uses existing power generation assets, while mitigating the cost of carbon
July 27, 2009,
Kevin Sullivan, Ronald Meijer
A new measuring system for the on-line monitoring and location of partial discharges (PDs) in medium-voltage power cables.
June 8, 2009,
Peter van der wielen, Fred Steennis
This paper provides a longitudinal view of CFL market saturation rates
May 28, 2009,
Thomas Ledyard, Susan Oman, Angela Li, Jeff Zynda
This paper provides a longitudinal view of CFL market saturation rates
May 28, 2009,
Thomas Ledyard, Susan Oman, Angela Li, Jeff Zynda
On assigment of the Dutch TSO, TenneT, KEMA has developed a new design for high voltage towers.
May 19, 2009,
J. van Wolven, C. Engelbrecht, I. Tannemaat
Approach for facility staff to establish a consistent methodology for annual greenhouse gas (GHG) inventories
May 2, 2009,
Julia Vetromile, Ray Alfini
The DC traction systems of trams and metro's causes a DC-magnetic field around the cables.
April 25, 2009,
Paul Hesen, Imre tannemaat, Claudi Stuurman, Monique Beerlage
Future Directions: Strategies and Technologies for Clean Power Generation
April 1, 2009,
Kevin Sullivan
The U.S. smart grid revolution KEMA’s perspectives for job creation.
January 13, 2009,
KEMA
A white paper on underground distribution cable reliability improvement.
January 1, 2009,
KEMA
Paper new SCADA system for EEQ.
December 1, 2008,
Raúl Ruiz, Antonio Adeva, Renato Céspedes, Patricia Gómez
This Reflections paper has been commissioned by the Ministry of Economic Affairs and prepared by KEMA.
November 3, 2008,
John Scott, Peter Vaessen, Frits Verheij
Beacon Power Energy Storage
October 24, 2008,
KEMA
Today, a database with TSO System Data and Performance Measures is available for the twenty-two members of the group.
September 29, 2008,
Bart Franken (KEMA), Laith Ahmed Albassam (Saudi Electricity Company, C.M. Mak (CLP Hong Kong), Albert Dicaprio (PJM), Oliver Scheufeld (KEMA)
Utility of the future - an emerging vision takes shape.
September 1, 2008,
Ralph Masiello, Hugo van Nispen, Robert Wilhite, Will McNamara (EnergyBiz)
Investigation on public concern after upgrading overhead line from 150 kv to 380 kV
July 21, 2008,
I. Tannemaat, M. Beerlage, C. Stuurman, C. Engelbrecht
Summary of KEMA validation report.
June 27, 2008,
KEMA
Regulatory mechanisms to mitigate the vulnerability of power systems to blackouts.
June 1, 2008,
O. P. Veloza, and R.H. Cespedes
ONS - Brasil new control center architecture conceptual design.
June 1, 2008,
J. M. Ordagci, H.C.T. Santos, S.R. Morand, R.Céspedes
Modernization of the national wide dispatch centers of CADAFE - Venezuela.
June 1, 2008,
R. Pirela, R. Pargas, and R. Céspedes
Modernization of the national wide dispatch centers of CADAFE - Venezuela.
June 1, 2008,
R. Pirela, R. Pargas, and R. Céspedes
Conference white paper: “Utility of the Future".
May 6, 2008,
KEMA
Renewable energy solutions: emerging technologies to watch.
March 1, 2008,
Liz Hicks, Karin Corfee
Experiences in investment decisions optimizing technicaland financial objectives
November 28, 2007,
J. Huisma, C. Koreman, K-J. van Oeveren
Enelven renovation project.
November 1, 2007,
Hely Socorro, Jorge Chapero, Marcus Firschherz, Renato Céspedes
Demand response: promise and reality.
September 1, 2007,
Robert Wilhite, Miriam Goldberg, Will McNamara (EnergyBiz)
For the production of power a lot of water is required. If 20 percent of this water could be recovered this plant would become self supporting.
June 6, 2007,
F.G. de Vos, R. Heijboer, H.M. van Deelen-Bremer
Implementing the smart grid: enterprise information integration.
June 1, 2007,
Ali Ipakchi (KEMA)
HV asset replacement TenneT.
June 1, 2007,
J. Huisma, C. Koreman, K-J. van Oeveren (TenneT)