Paper overview
In einem öffentlichen Wettbewerb hat der niederländische Infrastrukturbetreiber ProRail nach Ideen für Maßnahmen im Bahnenergieversorgungsnetz mit dem Ziel der nachhaltigen Senkung des Energiebedarfs und damit des CO2-Ausstoßes gefragt.
A critical factor affecting transmission system development is the assumed location
and size of generating units. The output of the generators is
set by the assumed generation dispatch.
Co-firing uses existing power generation assets, while mitigating the cost of carbon
A new measuring system for the on-line monitoring and location of partial discharges (PDs) in medium-voltage power cables.
This paper provides a longitudinal view of CFL market saturation rates
On assigment of the Dutch TSO, TenneT, KEMA has developed a new design for high voltage towers.
Approach for facility staff to establish a consistent methodology for annual greenhouse gas (GHG) inventories
The DC traction systems of trams and metro's causes a DC-magnetic field around the cables.
Future Directions: Strategies and Technologies for Clean Power Generation
The U.S. smart grid revolution KEMA’s perspectives for job creation.